Necesito una solución
Hi,
yesterday we configured the backup for our first SAP HANA applicance.
This was ok so far, we managed to do full and log backups.
The problem is:
How do I do full backups to tape, but log backups to disk?
There is the file initSAP.utl, but in there, I can only specify 1 policy and/or 1 schedule, so full and log backups go to the same schedule.
How do I send logs to a different Policy/ schedule than ful backups?
Thanks!
Volker